Applicable Operating Conditions
1. A swivel arm joint is used; the diameter of the swivel arm water supply pipe is ≤DN1400mm, and the water level difference is ≤20m.
2. In cases of strong winds or when anchoring is not suitable for the floating dock pump station, a main and auxiliary steel frame swivel arm positioning method is used.
Installation Diagram

1. Shore-mounted rotating bearing; 2. Auxiliary cantilever; 3. Inspection valve; 4. Expansion joint; 5. Multifunctional valve; 6. Water pump; 7. Inlet pipe; 8. Vacuum equipment; 9. Hull; 10. Outlet pipe; 11. Shipboard rotating bearing; 12. Rocker arm water supply pipe and trestle; 13. Rotary joint; 14. Shore-side support pier.
Keywords:
Z(P)F-Ⅲ Type Auxiliary Rocker Arm Floating Dock Pump Station
Consultation and Collaboration
Classification