Project Name: Langxi County Integrated Urban and Rural Water Supply Project (South-to-North Water Diversion)
Water Level Difference: 12.46 meters
Installation Location: Tianzimen Reservoir
Rocker Arm Length: 2 x 40 meters (Standard 2)
Total Flow Rate: 100,000 m³/d
Number of Pumps: 3 units (2 in operation, 1 on standby; 2 more to be added in Phase II)
Head: 24 meters
Voltage: 10KV
Commissioning Time: 2023
Keywords:
Langxi County Urban And Rural Water Supply Integration Project (South-To-North Water Diversion Project)
Consultation and Collaboration
Classification