Project Name: Water Supply Project for the New Construction of 2x660MW Units of Guodian Zhijin Power Generation Co., Ltd.
Water Level Difference: 70 meters
Installation Location: Hongjiadu Reservoir
Rocker Arm Length: 2 x 60 meters
Total Flow Rate: 76,800 m³/d
Number of Pumps: 3 (450KW)
Head: 37~110m
Voltage: 10KV
Keywords:
Supply Project For The New Construction Of 2x660mw Units Of Guodian Zhijin Power Generation Co., Ltd.
Consultation and Collaboration
Classification