Project Name: Hubei Yidu Dongyangguang (2×300MW CFB) Self-Supplied Thermal Power Plant Project
Water Level Difference: 16.46 meters
Rocker Arm Length: 45 meters
Installation Location: Yangtze River
Total Flow Rate: 300,000 m³/d + 24,000 m³/d
Number of Pumps: 8 units (6 560kW + 2 200kW)
Head: 58 meters
Voltage: 10kV