Project Name: Hubei Hannan Xigou Water Intake Project
Water Level Difference: 14.23 meters
Installation Location: Yangtze River
Voltage: 10KV
Rocker Arm Length: 32 meters
Total Flow Rate:
Number of Pumps: 2 units (Phase I: 216,000 m³/d)
Head: 15 meters (Phase II: Total Flow Rate 324,000 m³/d)
Keywords:
Hubei Hannan Xingou Water Intake Project
Consultation and Collaboration
Classification